skipToContent
SingaporeAll

MRT reliability hits near 1.5-year high as Downtown Line performance doubles

CNA Singapore Singapore
MRT reliability hits near 1.5-year high as Downtown Line performance doubles
The overall MRT network’s mean kilometres between failures increased to 2,220,000 train-km in April from 1,740,000 train-km in March.
Share
Original story
Continue reading at CNA Singapore
www.channelnewsasia.com/singapore
Read full article

Summary generated from the RSS feed of CNA Singapore. All article rights belong to the original publisher. Click through to read the full piece on www.channelnewsasia.com/singapore.